Data Centers
Backup generator exhaust has to cross the wall, and there is no way around it. Hell-Sea's pre-assembled penetration installs in a single operation, skipping the masonry and field-built trunk a conventional passage demands.
Exhaust through the wall
Backup generator exhaust has to cross the wall of the generator room or enclosure. Hell-Sea installs in a single operation, with no complex masonry and no field-built trunk.
Modular deployment
Containerised and edge data centers require exhaust penetrations fitted at the factory. Hell-Sea installs in under two hours, before the container leaves the production facility.
Zero maintenance
Every Hell-Sea kit is engineered for maintenance-free operation over the full service life of the installation, a critical requirement for always-on infrastructure.
Beyond ships: any hot pipe passage
The Exhaust penetration suits any hot pipe passage through a wall, bulkhead, deck or floor, not only ships. If your project crosses one with a hot exhaust line, tell us the pipe diameter and the structure and we will advise on the right kit.
Read about hot pipe penetrationsData Centers enquiries
Our engineers have specified Hell-Sea in the Data Centers sector. Send us your requirements, we respond within 24 hours.
Request a quote